Headline Allocations of Funding for 2026/27
|
|
|
Headline Allocation |
|
Previous Years |
Overspend from 2025/26 |
£3,500,000 |
|
Schemes moved from previous years |
£8,000,000 |
|
|
Block Allocations |
Bridges Allocation |
£3,000,000 |
|
PROW Allocation |
£380,000 |
|
|
PROW Bridges |
£300,000 |
|
|
Integrated Transport |
£2,240,000 |
|
|
Street lighting Allocation |
£1,500,000 |
|
|
Top Slices (Inspections and Surveys) |
Network Condition Surveys (Road AI / SCRIMI) |
£350,000 |
|
NYCC Traffic data Collection Contract |
£100,000 |
|
|
Site investigation / Pavement Investigation |
£300,000 |
|
|
Bridges and Structures Inspections |
£500,000 |
|
|
Highway Drainage Infrastructure Inspections |
£10,000 |
|
|
Bridges AMX |
£19,000 |
|
|
Bridge Assessments |
£200,000 |
|
|
Highways Innovation funding |
£100,000 |
|
|
Pre-Planning Application Advice |
£33,600 |
|
|
Fees and Overheads |
External Fees (Consultants) |
£2,500,000 |
|
North Yorkshire Highways costs |
£7,615,000 |
|
|
Capital Recharge contribution |
£5,000,000 |
|
|
UUR |
Cat 6 UURs |
£225,000 |
|
Footways and Cycleways |
Cat 1a, 1 and 2 Footways |
£500,000 |
|
Patching Cat 1a, 1 and 2 Footways |
£250,000 |
|
|
Cat 3, 4 and 5 Footways |
£700,000 |
|
|
Surface Treatment Cat 3, 4 and 5 Footways |
£525,000 |
|
|
Patching Cat 3,4 and 5 Footways |
£300,000 |
|
|
Cycle ways and Cycle track Schemes |
£100,000 |
|
|
Urban PROW |
£150,000 |
|
|
Other Engineering Schemes |
Landslip Schemes |
£850,000 |
|
Drainage Schemes |
£950,000 |
|
|
Vehicle Restraint Systems (VRS) |
£400,000 |
|
|
Other ‘Special Engineering Schemes’ |
£980,000 |
|
|
Cattle Grids |
£360,000 |
|
|
Parapets |
£1,000,000 |
|
|
Gullies |
£280,000 |
|
|
Carriageways |
Remaining Allocation for Carriageways (including £3.986M over programming) |
£23,501,000 |
|
|
Total |
£66,754,600 |