Headline Allocations of Funding for 2026/27

 

 

Headline Allocation

Previous Years

Overspend from 2025/26

£3,500,000

Schemes moved from previous years

£8,000,000

Block Allocations

Bridges Allocation

£3,000,000

PROW Allocation

£380,000

PROW Bridges

£300,000

Integrated Transport

£2,240,000

Street lighting Allocation

£1,500,000

Top Slices (Inspections and Surveys)

Network Condition Surveys (Road AI / SCRIMI)

£350,000

NYCC Traffic data Collection Contract

£100,000

Site investigation / Pavement Investigation

£300,000

Bridges and Structures Inspections

£500,000

Highway Drainage Infrastructure Inspections

£10,000

Bridges AMX

£19,000

Bridge Assessments

£200,000

Highways Innovation funding

£100,000

Pre-Planning Application Advice

£33,600

Fees and Overheads

External Fees (Consultants)

£2,500,000

North Yorkshire Highways costs

£7,615,000

Capital Recharge contribution

£5,000,000

UUR

Cat 6 UURs

£225,000

Footways and Cycleways

Cat 1a, 1 and 2 Footways

£500,000

Patching Cat 1a, 1 and 2 Footways

£250,000

Cat 3, 4 and 5 Footways

£700,000

Surface Treatment Cat 3, 4 and 5 Footways

£525,000

Patching Cat 3,4 and 5 Footways

£300,000

Cycle ways and Cycle track Schemes

£100,000

Urban PROW

£150,000

Other Engineering Schemes

Landslip Schemes

£850,000

Drainage Schemes

£950,000

Vehicle Restraint Systems (VRS)

£400,000

Other ‘Special Engineering Schemes’

£980,000

Cattle Grids

£360,000

Parapets

£1,000,000

Gullies

£280,000

Carriageways

Remaining Allocation for Carriageways (including £3.986M over programming)

£23,501,000

 

Total

£66,754,600